ITC™ Disk Specifications Minimum/Maximum Pressure with Rating at 72° (22°C)
BS&B supplies many of the Accessories required to safely and conveniently install our overpressure relief devices and complementary products. Through our professional team and global network of sales engineers and procurement personnel, we are able to provide the highest quality accessory products to meet your installation requirements.
After activation, the replacement disk is quickly slid into place. Saving hours of lost production due to blown rupture disks.
A gauge tap in the outlet flange of the safety head may be considered when the safety head is installed in a vertical position.
When activated, the jackscrews effectively separate the flanges, providing adequate clearance to remove or insert a safety head and external gaskets.
Eye bolts are recommended when weight and/or accessibility is a factor in lifting safety heads.
When a safety head is free-vented to atmosphere, a baffle plate may be considered to disperse overpressure and absorb recoil.
Specifically designed for protection of Intermodel Tank Containers
A range of sensors suitable for different rupture disk types used to provide immediate warning of a ruptured disk., #77-1003
The BS&B Safety Systems ITC™ Reverse Rupture Disk (Bursting Disc) is specifically designed for protection of intermodal tank containers. The ITC™ Reverse Rupture Disk (Bursting Disc) conforms with the latest norms IMO, ADR, RID, US DOT, DOT blue book and ISO. The ITC™ is a scored tension loaded rupture disk assembly.
Standard disk materials are Stainless Steel grade 316 & Nickel alloy 200. Other materials are available on request. Fluoropolymer film liners are offered with the type ITC™ rupture disk (bursting disc) at all burst pressures. All standard disks are available with 0%, 5%, and 10% manufacturing ranges.
The ITC™ rupture disk (bursting disc) has been flow tested with most major world tank valve manufacturers.
The ITC™ rupture disk (bursting disc) slips into the tank flange bore. The codes require that the space between the future disk and relief valve be fitted with a gauge or a suitable telltale indicator to detect a ruptured or a leaking disk.
The BS&B global team appreciate the support of our customers and suppliers during this challenging time.